Property Address |
530 Marshall Ave, Pittsburgh PA 15214-3016
|
Work Summary |
Set traffic control for the duration of this phase as defined in PATA figure 106. Contractor to coordinate work with PWSA. Field Locate the exact locations of existing water lines. Trench area of water line work 5' in depth or depth of waterline plus room to perform work (whichever distance is greater). Terminate existing water tap and remove 5-ft of pipe from water main per detail WS-STL. Cut water lateral 5-ft from tap, cap, and abandon remaining pipe in place. Restore pavement section per PennDOT Pub , APP. C8 - Hightway Restoration Figures.
|
General Date Range of Work |
2025-06-15 - 2025-08-15
|
Tap C Number From Approved Tap-in Plans e.g. C-XXXX |
C3191
|
Completed M-949C Form (see instructions for blank form) |
M-949C - Pressley Ridge Water HOP - 01-16-2025.pdf
|
Traffic Control Plan |
Pressley Ridge Water HOP Plan - 01-16-2024.pdf, PATA 106.pdf
|