Village Of Lake Barrington Building Department

Building Permit Application-Basic Plan Review

Feb 20, 2024
submission #1229
  • no final inspection requested VLB closed permit. will not verify work was completed to code.
Instructions and Application

Permit type

Primary permit type requested ---
Are you requesting an additional permit OTHER THAN WHAT YOU REQUESTED ABOVE? (select all that apply) ---
Will you be adding any electrical work to this project? ---

Property information

WORK SITE ADDRESS-include only the ADDRESS NUMBER, UNIT NUMBER/APT (if applicable) , & STEET (not the contractor's company address) ---
Parcel ID ---
Property type ---
Subdivision ---
Lot Number ---

Who is applying for the Building Permit?

Who is applying for the building permit ---

Owner's information

Property owner's FIRST name ---
Property owner's LAST name ---
Property owner's address-ADDRESS NUMBER AND STREET ---
City ---
State ---
Zip Code ---
Property owner's telephone number ---

Residential detail

Is this property located in the Lake Barrington Shores Gated Community? ---

Description of work

Please provide a detailed description of the work to be performed. ---

Roofing Projects

Upload the product specifications for the project here - zip files and spreadsheets are NOT accepted ---
Will there be any structural changes to the roof? ---
Will you be adding or removing and replacing skylights the with new for this project? ---

Removal of old skylights, replacing with new

Upload the specification for the new skylight(s) here - zip files and spreadsheets are NOT accepted ---

Value of work

Total cost of the project. ---

Who is performing work

Who will be performing the work? ---
Is there a subcontractor for this project? ---

Contractor information

Contractors COMPANY NAME or name of contractor if NOT a company ---
Contractors address, include city and zip code ---
Contractors phone ---
Contractors email address ---
Contractor's License number with the VILLAGE OF LAKE BARRINGTON ---
Expiration date ---

Contractor Proposal

Upload a copy of the contractors proposal. - zip files and spreadsheets are NOT accepted ---
Acknowledgement of Covenants & Affidavit

Acknowledgement of Covenants

I have read and agree to the above statement. ---

Affidavit

I have read the affidavit and I agree to the terms of the permit. ---
Plan Review

Permit Type

Permit Type R&R ROOFING WITH NEW VENTS - PLBG FLASHINGS - CHIMNEY FLASHING - 2 NEW SKYLIGHTS

Building inspections required-Placard

Building inspections Required Rough Building , Rough Ice and Water Shield, Final Building

Additional Permit Information

Add any additional information needed on the placard

Plan review notes

Miscellaneous Plan Review Notes The maximum u-factor shall be 0.30., The ice barrier shall consist of not fewer than two layers of underlayment cemented together, or a self-adhering polymer-modified bitumen sheet shall be used in place of normal underlayment and extend from the lowest edges of all roof surfaces to a point not less than 24 inches inside the exterior wall line of the building. On roofs with slope equal to or greater than 8 units vertical in 12 units horizontal, the ice barrier shall also be applied not less than 36 inches measured along the roof slope from the eave edge of the building.

Fee determination

Decks: Number of additional square feet (above 200) for fee calculation 0
Signs: Confirm # of extra square feet above 30 for signs ---
Fences: Confirm number of feet for fence fee above 285 ---
Should additional inspection fees be added to total? ---
Additional custom fee to be added ---
Notes on additional/ custom fee ---
Issue Permit

Permit Issued

Today's date ---
Expiration date ---
Permit Number ---
Is a permit extension needed for this project? ---
Inspection reports

Inspection results

Rough ---
Final ---