Building Permit Application-Basic Plan Review
Nov 17, 2023
submission
#1141
B&F Plan Review
Building inspections required-Placard
Building inspections Required | Soil Erosion/Sediment Control Inspection-contact Engineer to schedule, Rough Base BEFORE placing asphalt, Rough Base BEFORE placing Pavers/Concrete, Rough Building BEFORE TRIM, Rough Building , Rough Electrical, Rough Mechanical, Rough Ice and Water Shield, Rough Post Hole BEFORE concrete is poured, Rough-Fire Protection BEFORE insultation- HYDRO, Final Building, Final Electrical , Final Fire Protection, Final Mechanical, Final Plumbing , Final Engineering (As Built Survey & Final Site Visit Approval Required |
Additional Permit Information
Add any additional information needed on the placard | test test test tes |
License Number | 10-2222 |
Fee determination
Decks: Number of additional square feet (above 200) for fee calculation | 0 |
Signs: Confirm # of extra square feet above 30 for signs | --- |
Fences: Confirm number of feet for fence fee above 285 | --- |
Should additional inspection fees be added to total? | --- |
Additional custom fee to be added | --- |