Village Of Lake Barrington Building Department

Building Permit Application-Basic Plan Review

Nov 17, 2023
submission #1141
B&F Plan Review

Building inspections required-Placard

Building inspections Required Soil Erosion/Sediment Control Inspection-contact Engineer to schedule, Rough Base BEFORE placing asphalt, Rough Base BEFORE placing Pavers/Concrete, Rough Building BEFORE TRIM, Rough Building , Rough Electrical, Rough Mechanical, Rough Ice and Water Shield, Rough Post Hole BEFORE concrete is poured, Rough-Fire Protection BEFORE insultation- HYDRO, Final Building, Final Electrical , Final Fire Protection, Final Mechanical, Final Plumbing , Final Engineering (As Built Survey & Final Site Visit Approval Required

Additional Permit Information

Add any additional information needed on the placard test test test tes
License Number 10-2222

Fee determination

Decks: Number of additional square feet (above 200) for fee calculation 0
Signs: Confirm # of extra square feet above 30 for signs ---
Fences: Confirm number of feet for fence fee above 285 ---
Should additional inspection fees be added to total? ---
Additional custom fee to be added ---