Permit Application and Document Submittal (Applicant)
Permit Type
| What type of permit are you applying for? |
Alteration
|
Applicant Information
| Applicant's Business Name |
---
|
| email |
[email protected]
|
| phone |
303.444.4780
|
| address |
1232 Boston Avenue Longmont, CO 80501
|
| Applicant's Contact Person Name |
---
|
| Applicant's Contact Person Title |
---
|
| Applicant's Contact Person Phone Number |
---
|
| Applicant's Contact Person Email |
---
|
Project Information
| Project or Occupant Name |
Zuni 7th Floor Renovation
|
| Project or Occupant Address |
5325 Zuni St, Denver CO 80221-1499
|
| Is the permit for which you are applying for a new or existing building occupant? |
---
|
| Provide a brief description of the scope of the project: |
---
|
| Valuation |
---
|
Building Information
| Construction Type |
---
|
| Occupancy Group Classification(s) |
---
|
Gate Specifics and Documents
New Construction Specifics and Documents (Commercial)
New Construction Specifics and Documents (Residential - Multifamily/Apartment Buildings)
| How many units are within the scope of this permit? |
0
|
| Actual Square Feet |
0
|
Alteration Specifics and Documents
| Actual Square Feet Impacted by the Alteration |
17711
|
| The following ranges are used in our fee calculations. Please select the range in which the actual square footage falls within. |
15,001 - 100,000 square feet
|
| Full Set of Plans (Architectural and MEP) |
---
|
Fire Sprinkler Specifics and Documents (New System)
| Square Feet of System Coverage |
0
|
Fire Sprinkler Specifics and Documents (Modification)
| Number of Heads Modified or Added |
0
|
Fire Alarm Specifics and Documents (New System)
| Square Feet of System Coverage |
0
|
Fire Alarm Specifics and Documents (Modification)
| Number of Devices Modified or Added |
0
|
Hood Suppression System Specifics and Documents
Flammable Spray Booth and Mixing Room Suppression System Specifics and Documents
Chemical Suppression System Specifics and Documents
Addition Specifics and Documents
| Actual Square Footage of Existing Building |
0
|
| Actual Square Footage of Addition |
0
|
Temporary Structure Specifics and Documents
Tank Permit Specifics and Documents
Permit File Creation and Impact Fee Assessment (Admin)
Impact Fee Requirement
| Is an impact fee applicable to this project? |
No
|
| Impact Fee Amount |
$0.00
|
Reviewer Information
| Will these plans be reviewed by ACFR staff or our third party? |
ACFR staff
|
Plan Review - Revisions Requirement (Reviewer)
Revisions Requirement
| Are revised documents required at this time? |
Yes
|
Plan Review - Document Upload, Fee Assessment, and Inspection Review (Reviewer)
Reviewed Document Upload
| Stamped and Flattened Plans |
---
|
| Comment Letter |
---
|
Permit Fee Review
| Is there a permit fee due? |
---
|
| Permit fee amount: |
$817.78
|
Required Inspections
| Choose all required inspections for this permit: |
Alteration
|
| Is there another type of inspection required that is not listed above? |
No
|
| Other inspection: |
N/A
|
Deferred Submittals Required
| Are deferred submittals required? |
Yes
|
| Choose all required deferred submittals required: |
Fire Alarm, Fire Sprinkler
|
Payment Method (Applicant)
Payment Method
| Which payment method will you be utilizing to pay the permit fee? |
---
|
Fee Payment Verification (Admin)
Permit Fee Payment Check
| Was the permit fee collected and documented using the fee collection process? |
---
|
| What is the associated fee collection process number? (Example: FC-YY-###) |
Invoice 1200
|
Final Document Review and Inspection Assignment (Admin)
Final Document Upload
Permit Expiration Date
| Date of Expiration |
2023-04-26
|
Required Inspections
| Required Inspections (Final Review) |
Alteration Final
|