ACFR Fire Prevention

Permit Application

Jun 27, 2022
submission #245
Permit Application and Document Submittal (Applicant)

Permit Type

What type of permit are you applying for? Alteration

Applicant Information

Applicant's Business Name ---
website www.westfield-co.com
email [email protected]
phone 3038816611
address 4221 Brighton Blvd.
Applicant's Contact Person Name ---
Applicant's Contact Person Title ---
Applicant's Contact Person Phone Number ---
Applicant's Contact Person Email ---

Project Information

Project or Occupant Name Pecos | Building 6 Speculative Tenant Suite TI
Project or Occupant Address 5725 Pecos St Ste 300, Denver CO 80221-6660
Building Number/Letter (if applicable) Old building 6 / new building 3, lot 2
Unit Numbers/Letters (if applicable) 300
Is the permit for which you are applying for a new or existing building occupant? ---
Provide a brief description of the scope of the project: ---
Valuation ---

Building Information

Construction Type ---
Occupancy Group Classification(s) ---

Gate Specifics and Documents

Number of Gates 0

New Construction Specifics and Documents (Commercial)

Actual Square Feet 0

New Construction Specifics and Documents (Residential - Multifamily/Apartment Buildings)

How many units are within the scope of this permit? 0
Actual Square Feet 0

Alteration Specifics and Documents

Actual Square Feet Impacted by the Alteration 2100
The following ranges are used in our fee calculations. Please select the range in which the actual square footage falls within. 1 - 10,000 square feet
Full Set of Plans (Architectural and MEP) ---
Additional Documents ---

Fire Sprinkler Specifics and Documents (New System)

Square Feet of System Coverage 0

Fire Sprinkler Specifics and Documents (Modification)

Number of Heads Modified or Added 0

Fire Alarm Specifics and Documents (New System)

Square Feet of System Coverage 0

Fire Alarm Specifics and Documents (Modification)

Number of Devices Modified or Added 0

Hood Suppression System Specifics and Documents

Number of Systems 0

Flammable Spray Booth and Mixing Room Suppression System Specifics and Documents

Number of systems 0

Chemical Suppression System Specifics and Documents

Number of Systems 0

Addition Specifics and Documents

Actual Square Footage of Existing Building 0
Actual Square Footage of Addition 0

Temporary Structure Specifics and Documents

Number of Structures 0

Tank Permit Specifics and Documents

Number of Tanks 0
Permit File Creation and Impact Fee Assessment (Admin)

Impact Fee Requirement

Is an impact fee applicable to this project? No
Impact Fee Amount $0.00

Reviewer Information

Will these plans be reviewed by ACFR staff or our third party? ACFR staff
Plan Review - Revisions Requirement (Reviewer)

Revisions Requirement

Are revised documents required at this time? No
Plan Review - Document Upload, Fee Assessment, and Inspection Review (Reviewer)

Reviewed Document Upload

Stamped and Flattened Plans ---
Comment Letter ---

Permit Fee Review

Is there a permit fee due? ---
Permit fee amount: $1,863.00

Required Inspections

Choose all required inspections for this permit: Alteration
Is there another type of inspection required that is not listed above? No
Other inspection: N/A

Deferred Submittals Required

Are deferred submittals required? Yes
Choose all required deferred submittals required: Fire Alarm, Fire Sprinkler
Payment Method (Applicant)

Payment Method

Which payment method will you be utilizing to pay the permit fee? ---
Fee Payment Verification (Admin)

Permit Fee Payment Check

Was the permit fee collected and documented using the fee collection process? ---
What is the associated fee collection process number? (Example: FC-YY-###) FC-22-155
Final Document Review and Inspection Assignment (Admin)

Final Document Upload

Stamped and Flattened Plans Plans Alteration - Spec Suite 300 - 5725 Pecos Street Bldg. 3 Suite 300 - ACFR Reviewed 07182022 (1).pdf
Comment Letter Comment Letter Alteration - Spec Suite 300 - 5725 Pecos Street Bldg. 3 Suite 300 - ACFR Reviewed 07182022.pdf
Fee Receipt Fee Collection-155.pdf

Permit Expiration Date

Date of Expiration 2023-01-29

Required Inspections

Required Inspections (Final Review) Alteration Final